Sunday, 14 September 2014

GENERAL VIEW -8 WHEELER OHE TOWER CAR


50 MUST KNOWING QUESTIONS WITH ANSWERS ABOUT TRD ......  
                                      Q.1. ‘N’ type of portal covers how many maximum number of tracks ?
A.. 4 nos.
Q.2 How much weight is provided in the 3 pulleys ATD?
A. 665kg.
Q.3. What is the tension provided in regular OHE in each conductor?
A.. 1000 Kg.
Q.4. What is the length of S.S.wire rope of 3 pulleys type ATD ?
A.. 08.50 mts.
Q.5. What should be the spacing of ‘G’ jumper on X/O from obligatory mast ?
A.. 5.6 M.
Q.6. Why Capacitor Bank is used for TR-D system ?
A.. To improve power factor.
Q.7. What is the full form of SCADA ?
A.. Supervisory Control and Data Acquisition System.
Q.8. What is the dimension of TTC upright for 5.5 mt boom?
A.. 300 mm X 225 mm
Q.9. What is the minimum encumbrance at Section insulator ?
A.. 0.40 mts.
Q.10. What is the trailing end swept zone clearance?
A.. 1.72 mts.
Q.11 How many earth rods are required to be provided on OHE before working on it?
A. 2 nos.
Q.12. What is the relative gradient of contact wire on main line ?
A.. 1.5 mm/mt in main line.
Q.13. What should be the spacing of Insulated overlap from starter signal?
A.. 120mts.
Q.14. What is the length of an OHE mast ?
A.. 9.30 m or 9.50 m.
Q.15. What should be the soil pressure for providing pure gravity foundation ?
A. 8250 to 11000 Kg f/m.
Q.1 6. What should be the minimum encumbrance of OHE ?
A.. 15 cms.
Q.17. What is the minimum and maximum voltage of OHE at feeding post?
A. 23.75 & 27.50kv
Q.18. What should be the IR value (minimum) for 25 kv lightning Arrestor?
A.. Infinity.
Q.19. What should be the minimum clearance between P.F. Shed and OHE ?
A. 1.70 M.
Q20. What should be the minimum vertical distance from 25kv line to ground level?
A.. 3 mts.
Q.21. What should be the minimum implantation of obligatory mast at T/Out & X/O ?
A.. 3 mts.
Q.22. What is the full form of BT & TT & ATD?
A. Bracket Tube, Telescopic Tube & Auto Tensioning Device
Q.23. What is the maximum permissible speed of a conventional OHE where section insulator provided in facing direction?
A. 80 KMPH.
Q24. What should be the minimum clearance between contact wire to runner of Section Insulator?
A. 23 cm.
Q.25 What is the full form of CTD provided in a circuit Breaker ?
A Capacitor tripping device
Q.26. In an A.C traction where is 100 KVA A.T. usually provided?
A. Traction sub-station.
Q.27. What is the angle of grove of contact wire ?
A.. 78°.
Q.28. What should be the take off of panto at X/O or T/O ?
A.. 650 mm - 720 mm.
Q.29. What is the operating voltage of Crompton SF6 gas C.B. ?
A.. 110 V D.C.
Q 30. What should be the track separation and where the obligatory structure can be located on a X/O or T/O ?
A. 150 mm – 700 mm.
Q.31 What should be the maximum permissible distance of a Section Insulator from a support on a 49.5 M span?
A.. 15 M.
Q.32. What should be the minimum distance of PTFE N/S after stop signal on level tangent track ?
A. 200 mts.
Q.33. What is the facing and swept zone clearance ?
A. 1.60 mt.
Q.34. What is the minimum clearance between cradle guard of line crossing OHE to catenary wire ?
A.. 2 mt.
Q.35 What is the total tension provided on unregulated OHE ?
A. 3000 Kg.
Q.36 What is the cross sectional area of catenary wire ?
A. 65.40 sq. mm.
Q.37. What is the condemned diameter of contact wire on Loop/Yard line ?
A 8.00 mm.
Q.38. What is the minimum distance between two droppers ?
A. 4.50 mt.
Q.39. What is the minimum permissible height of contact wire ?
A. 4.65 mt.
Q.40. Where and what type of bond is essential to be provided at any level crossing gate ?
A.. Cross bond in either side of L/C gate within 5mts .
Q.41. Why lightning arrestor have been provided in OHE ?
A. To divert surge into ground.
Q.42. How many strands are there on outer layer of catenary wire?
A.. 12 nos.
Q.43. What is the maximum span length of X/O span ?
A.. 54 M.
.Q.44. What is the maximum no. of contact Splices allowed on half tension length of 600 m ?
A. 6 Nos.
Q.45 What is the cross sectional area of ‘G’ jumper ?
A. 105 sq.mm.
Q.46 What are the relays used in a feeder protection ?
A. O.C, W.P.C, D.P. .
Q.47 What is the interval of emergency socket provided along the track ?
A.. 750 mts to 1km .
Q.48 What is the maximum permissible earth resistance of TSS. ?
A. 0.5W.
Q.49 What are the factors for replacement of contact wire ?
A Number of splices and condemned diameter.
Q.50 What happened if one strand of catenary wire has remained inside the groove of cone of splice?
A. catenary wire will slip.

Grant of pay scale to Tower Wagon Drivers at par with the Goods Drivers not admissible

Grant of pay scale to Tower Wagon Drivers at par with the Goods Drivers not admissible


Circular Info
Railway Board Letter No: 
 PC-V/2000/CC/16/Pt. dated 15.11.2010
Date: 
 15/11/2010
Circular Subject: 
 Grant of pay scale to Tower Wagon Drivers at par with the Goods Drivers – Hon’ble Supreme Court’s judgement in SLP[C] No.365/2007
1.            Arising out of an SLP[C] No.365/2007 [ UOI & Ors. vs. Jagdish Pandey & Ors] filed by Railway Administration regarding the grant of pay scale to Tower  Wagon Drivers at par with the Goods Train Drivers, the Hon’ble Supreme Court vide their order dated 08.07.2010 while dismissing the said SLP have further observed, interalia, as under:

      “...During the course of arguments this was also brought to our notice that most of the respondents in the present appeal have already retired from service and there exist no justification for affecting any recoveries from their salaries as they have already worked and received their salaries as granted by the Union of India.

      For the reasons afore stated, we find no legal infirmity in the judgements of the Tribunal and the High Court. While dismissing this appeal we make it clear that this judgement will not affect the right of Union of India  to pass an appropriate order in relation to the pay scale applicable to any class of its employees including the respondents afresh and in accordance with law.  We do hope that if such an order is passed it will be upon proper application of mind and after taking into consideration appropriate  material and /or data.”

2.         Keeping in view the specific observation of Hon’ble Supreme Court regarding the position of the respondents involved in this case, it has been decided to comply with as a special case.  Further, in compliance of the above observations of the Hon’ble Supreme Court the issue regarding grant of pay parity to Tower Wagon Drivers with Goods  Train Drivers has been considered by the Competent Authority and it has been observed as under: 

2.1       That as regards eligibility and the mode of filling up the post, it is seen that the post of Goods Drivers is filled up from Shunter/Asst. Drivers on promotion.   Further in terms of Board’s orders RBE No. 152/2001, educational qualification for the post is Matriculate and Act Apprentice passed or ITI passed or Diploma in Mech./Elec./Electronics in lieu of ITI.  Whereas, the post of Tower Wagon Drivers are filled up  from the existing Motor Vehicle Drivers for which  educational qualification is class VIII Pass with ability to read and understand the traffic rules and other electrical safety rules along with heavy Motor Driving License. 

2.2       That the nature of duties & responsibilities of Goods Drivers is much more strenuous and  difficult vis-à-vis that of Tower Wagon Drivers [TWDs].   While Goods Drivers have immensely greater responsibility of driving a Goods Train independently with large number of wagons and the job calls for great amount of alacrity and concentration, Tower Wagon Drivers drive single Motor Car only on specified area to carry staff for attending brake downs in their jurisdiction within about 30 Kms.

2.2.1     That normal duty hours of Goods Drivers are 10 hours, while that of TWDs is 8 hours. 

2.2.2     That Goods Drivers are responsible for running extremely heavy duty Locomotives varying from 3850 to 6000 Horse Power, while the type of Tower wagons driven by TWDs are of a maximum of 530 Horse  Power. 

2.2.3     That a Goods Driver has to study log book and inspect the Locomotive [Engine] and follow other instructions as laid down in the Operating Manual of the particular class of Locos.  No such work is required to be done by TWDs.

2.2.4     That several other technical aspects are involved in the job profile of a Goods Driver such as careful examination of the State of OHE of his own line and lines in proximity, the Under- Gear, the brake of the train, lower the Pantograph and earth the Locomotive before carrying out any work in the high tension Compartment.  TWDs are not required to perform any such technical or specialized work. 

2.2.5     That Goods Drivers have to work with different load like 58 ‘N’/loaded, 40 BCN, 40BOX, 41BRH loaded/empty.  They have to also  keenly observe Signal, the vacuum and pressure Gauge, etc. to ensure that everything is in order. 

2.2.6     That while taking charge of the train, Goods Driver has to check continuity integrity/completion of rake, Brake continuity test ensuring adequate brake power, revalidation of brake power/vacuum certificate.  ON the contrary, TWDs are not required to perform any such responsibility. 

2.2.7     That Goods Drivers have to undergo Technical Refresher course training for Two weeks  for every three years.  TWDs are not required to undertake any such training. 

2.2.8     That at  the time of signing on duty, a Goods Driver has to read various registers such as ON Duty Register, Green Notice Register, Caution Order Register, Current Safety Instruction, Current Technical Circulars, Breath Analyser Test Register, Line abnormalities register etc. No such reading of books or registers is done by TWDs.

2.2.9     That while signing off from duty, Goods Drivers are required to fill up Combined Trains Report, Line abnormalities like Signal, Track, Loco defect Register etc and they have to perform any other kind of additional prescribed work.  Tower Wagon Drivers are free of all such duties. 

2.3       That in view of the onerous responsibility and more sensitive nature of the job profile of Goods Driver, a training period of 90 days is prescribed for them despite the fact that they are from the same Loco feeder stream i.e. Asstt. Driver.  The training period of Tower Wagon Drivers is of merely 30 days.

3.         From the above position, it is clear that in terms of appointment, recruitment, qualifications, nature of duties and level of responsibilities and also training period, TWDs are not comparable with Goods Drivers. 

4.         Further, the Hon’ble Supreme Court, in their judgements on various occasions, have held that unless there is wholesome and complete identity between the two categories, there lies no case for pay parity amongst them.

5.         In view of the above observations, the competent authority have decided that Tower Wagon Drivers are not entitled for grant of pay scale of Rs. 5000-8000 at par with that of Goods Drivers and they shall continue to be in the scale of Rs, 4000-6000 and  Rs. 4500-7000.

Subject of Speed Certificate of tower wagon by RDSO

Tower Wagon
SNType of stockReferenceMax. permissible speed (kmph)Subject of Speed Certificate
1.BG 4-Wheeler over head equipment inspection car Mark-III with modified suspension, manufactured by Jamalpur WorkshopMC/TW dt. 12.05.199840Final maximum permissible Speed Certificate for operation of BG 4-Wheeler over head equipment inspection car Mark-III with modified suspension, manufactured by Jamalpur Workshop at Eastern Railway
2.BG 4-Wheeler over head equipment inspection car manufactured by M/s Ventra Locomotive Co. Ltd.MC/TW dt. 02-08-199975Final maximum permissible Speed Certificate for operation of BG 4-Wheeler over head equipment inspection car manufactured by M/s Ventra Locomotive Co. Ltd., Hyderabad
3.BG 4-Wheeler over head equipment inspection car manufactured by M/s Punjab Power Generations Machines Ltd.MC/TW dt. 22.06.200075Final maximum permissible Speed Certificate for operation of BG 4-Wheeler over head equipment inspection car manufactured by M/s Punjab Power Generations Machines Ltd., Chandigarh
4.BG 4-Wheeler over head equipment inspection car Mark-II manufactured by Kanchrapara workshopMC/TW dt. 21.10.199940Final maximum permissible Speed Certificate for operation of BG 4-Wheeler over head equipment inspection car Mark-II manufactured by Kanchrapara workshop of Eastern Railway
5.BG 4-Wheeler self propelled over head equipment inspection car manufactured by MIs Phooltas Tamper Pvt., Limited, PatnaMC/TW dt.19-05-201075Final Speed certificate of BG 4-Wheeler self propelled over head equipment inspection car manufactured by MIs Phooltas Tamper Pvt., Limited, Patna upto a maximum speed of 75 kmph.